AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KARI-RI-KATO-KAME | Rubble stones | CY | ||||||||||
| ME_MEKAKA_RIKA | Worker Category 1 | hrs | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 27.56 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KARI_KAMEKA | Non-self-propelled barges operating in open waters, lifting capacity 275.58 ton | Machine hours | ||||||||||
| PU_MEKAKA_MEKAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KATO_KAKADX | Diesel tugs operating in open waters, power 400 HP (294 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 4 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-KADX_KAKADX | Floating cranes for working in open waters, self-propelled, 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEPU | Personnel: 7 person-hours/machine-hours | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|