Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Calculate this in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Electric bridge crane, lifting height - 52.5 ft; speed: lifting - 2.2-19.2 m/min, trolley movement - 19.2-43 m/min, crane movement - 37.8-120 m/min; load capacity, up to 16 tons, span 10.5+16.5 m

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/