AI
CSI
NRM2
Workers
Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KASA | Heavy concrete mixes | CY | ||||||||||
| KAPU-TO-KAME-KADX | Ready-made finishing mortar | CY | ||||||||||
| KAVO-PU-KATO-KATO | Rebar | ton | ||||||||||
| ME_MEKAKA_SAKA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KANE_KAKASAME | Grease, solid, fat-based, type Z | lb | ||||||||||
| KAME-TO-KASA-KATO_KAKAKASA | Purified ammonium sulfate (ammonium sulfate) | ton | ||||||||||
| KAME-TO-KASA-KATO_KAKARIME | Double-substituted ammonium phosphate (diammonium phosphate) | ton | ||||||||||
| KAME-TO-KASA-RITO_KAMEKATO | Sodium lauryl sulfate | lb | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-MESA-KANE_KAMESAME | Reinforced nails | lb | ||||||||||
| KAME-LI-RIKA-KAVO_KAMENERI | Burlap fabric, width 37.40 in, surface density 0.560 oz/SF | 10 LF | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | CY | ||||||||||
| KATO-RI-KAME-KAME_KAKAKAME | Portland cement without additives for general construction CEM 0 32.5N | ton | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKADX | Custom-made steel structures made of rolled steel, C345 steel | ton | ||||||||||
| KAVO-RI-KARI-KASA_KAKAPURI | Double-twisted rope LK-R, construction 6x19(1+6+6/6)+1 o.s., grade B, made of uncoated wire, marking group 1570-1770 N/mm2, diameter 0.551 in | 10 LF | ||||||||||
| KAVO-TO-KATO-KAPU_KAKASAME | Black wire, diameter 6.0-6.3 mm | ton | ||||||||||
| KAVO-TO-KATO-KANE_KAKAKAME | Knitting wire | lb | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length 3-6.5 m, diameter 14-24 cm, grade II-III | CY | ||||||||||
| MEME-ME-KATO-KAME_KAKANERI | Edged softwood beams (spruce, pine), natural moisture content, length 2-6.5 m, width 0.787-3.543 in, thickness 0.787-3.543 in, grade II | CY | ||||||||||
| MEME-ME-KATO-KANE_KAKALIVO | Edged softwood boards, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 1.73-1.97 in, grade II | CY | ||||||||||
| MEME-ME-KATO-KANE_KAKAVORI | Edged softwood board, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 0.787-0.866 in, grade II | CY | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 27.56 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KANE_KASANE | Mine hoists for lining industrial pipes, height 393.7 ft | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 4 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KALI-KAPU_KARIME | Vibrating hoppers | Machine hours | ||||||||||
| DXME-KALI-KAPU_KATOME | Vibrating chutes | Machine hours | ||||||||||
| DXME-MEPU-KATO_KAKARI | Dump trucks, load capacity up to 11.02 ton | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKAVO | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 15.7 CY/min | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MEKA_KAMEME | Stationary electric pumping stations, flow rate 261.6 CY/h, head 311.7 ft | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MEKA_KAMEME | Electricity: consumption 29.7 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||