Workers

Use this position in your own project

The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.

Calculate this in OpenConstructionERP

Export & Share

Free
  • 15
Pro 9,90

PayPal
Fastening of drainage channels with precast reinforced concrete, inclined workings 13-30 degrees, with the laying of a cover on the trough, cross-sectional area of the channel in the passage (in the tunnel), m2, up to 0.036 (0.038) m2

QR Code & Share

Scan QR code or share link

Share via

Zur Kalkulation hinzufügen

/