AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-TO-KARI-KAPU | Concrete mixes | CY | ||||||||||
| ME_MEKAKA_TOSA | Worker Category 1 | hrs | ||||||||||
| KALI-RI-KALI-MERI_KAKAMEME | Metal structures of buildings and structures with a predominance of bent profiles and round pipes | ton | ||||||||||
| DXME-RIKA-KATO_KAKAME | Tugs, power 150 HP (110 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-KADX_KAKAME | Non-self-propelled floating cranes, 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 5 person-hours/machine-hours | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||