AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-TO-KAME-KASA | Paraffins | ton | ||||||||||
| ME_MEKAKA_TOKA | Average workload 3.0 | hrs | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | lb | ||||||||||
| MEPU-SA-KADX-KASA_KAKAKAME | Fast-evaporating degreasing cleaner | gal | ||||||||||
| MEVO-ME-KADX-KAVO_MEKAPURI | Brass ball valve, threaded connection, nominal diameter 0.787 in | EA | ||||||||||
| RITO-VO-KATO-KAME_KAKAKARI | Metal inventory plugs | ton | ||||||||||
| DXME-KASA-KAME_KAMEVO | Tower cranes, lifting capacity 11.02 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMEVO | Electricity: consumption 7.84 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KANE_KAPURI | Hydraulic lifts, lifting height 32.8 ft | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KANE_KAPURI | Electricity: consumption 1.49 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KALI_KAKAME | Manual lever hoists | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KATO_KARIME | Mobile diesel fuel heating furnaces, tank capacity 0.5 m3 | Machine hours | ||||||||||
| DXME-MELI-KATO_KAPUME | Units for heating metal barrels with a capacity of 200 l, power 4 HP (3 kW) | Machine hours | ||||||||||
| DXME-MELI-KATO_KAPUME | Electricity: consumption 0.99 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAKARI | Pumps, capacity 32.7 CY/h, head 49.2 ft, power 2.8 kW | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAKARI | Electricity: consumption 0.92 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||