AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAPU-ME-KARI-KASA | Heavy concrete mixes | CY | ||||||||||
| RIPU-RI-KATO-KAME | Concrete mixer | EA | ||||||||||
| RI_MEKAKA_KAME | Grade 1 worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KANE | Grade 6 worker | hrs | ||||||||||
| KAME-LI-KALI-MERI_KAKARITO | Polyethylene insulation film, thickness 0.2-0.5 mm | SF | ||||||||||
| KAME-LI-MEDX-KAME_KAKATOME | Concrete hose, diameter 4.92 in | LF | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | CY | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 1.73-1.97 in, grade III | CY | ||||||||||
| DXME-KANE-KATO_KADXDX | Mobile tunneling winches with housing, static rope tension 160 kN (17.64 ton), rope capacity 4921.3 ft | Machine hours | ||||||||||
| DXME-KANE-KATO_KADXDX | Electricity: consumption 0.77 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KARI_KATORI | Trailer-mounted electric concrete pumps, capacity 13.1 CY/h | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KARI_KATORI | Electricity: consumption 5.91 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-MEME_SAKANE | Solvent receiving and feeding units, capacity 5.2 CY, productivity 0.5 m3/min | Machine hours | ||||||||||
| DXME-KALI-MEME_SAKANE | Electricity: consumption 2.89 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||