AI
Workers
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PULI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEDX-KAPU_KAKAPUKA | Rubber plates 1F-I-MBS-M, thickness 0.039-0.787 in | lb | ||||||||||
| KAME-LI-RIKA-KAVO_KAMERIRI | Cotton wipes, dimensions 400x15.75 in, surface density from 105 to 0.384 oz/SF | SF | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKALI | Custom-made steel structures from rolled steel | ton | ||||||||||
| MEPU-ME-KAPU-KARI_KAKAKAME | Adhesive, brand 88-NP | lb | ||||||||||
| DXME-KATO-KARI_KAKAME | Portable fans for normalizing the air environment in confined spaces, capacity up to 1308.0 CY/h | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Gantry cranes, lifting capacity 55.12 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKANE | Electricity: consumption 51.15 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMEKA | Electric bridge cranes, load capacity 55.12 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMEKA | Electricity: consumption 46.7 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KASASA | Electric winches with a pulling force of 19.62 kN (2.20 ton) | Machine hours | ||||||||||
| DXME-KANE-KATO_KASASA | Electricity: consumption 0.39 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-KADX-KASA_KARIRI | Broad gauge shunting locomotives, power 750 HP (550 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||