AI
Workers
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_NEKA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-MEDX-KADX_KAKARIPU | Rubber-fabric pressure hose for water with a pressure of 1 MPa (10 kgf/cm2), inner diameter 1.26 in | LF | ||||||||||
| RITO-TO-KANE-KAPU_KAKAMEME | Non-galvanized welded steel pipes for water and gas pipelines with threads, light, nominal diameter 1.97 in, wall thickness 0.118 in | LF | ||||||||||
| DXME-MEDX-KAPU_KAKARI | Drilling pumps for pumping flushing fluid, flow rate up to 41.9 CY/h, pressure up to 1312.3 ft | Machine hours | ||||||||||
| DXME-MEDX-KAPU_KAKARI | Electricity: consumption 16.5 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-METO_KAMEME | Trailed steam generators | Machine hours | ||||||||||
| DXME-RIME-METO_KAMEME | Electricity: consumption 61.05 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||