AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MEPU-PU-KARI-KADX | Quartz-based paint | lb | ||||||||||
| MEPU-SA-KAVO-KASA | Decorative textured compounds based on quartz granules | lb | ||||||||||
| MEPU-SA-MEME-KAME | Oil-glue putty | ton | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-MELI-MEME_KAKAKARI | Sanding paper | SF | ||||||||||
| MEPU-TO-KAME-KARI_KAMEKAME | Acrylic primer VD-AK-133 | ton | ||||||||||
| DXME-KANE-KANE_KAPUVO | Single-mast hoists, load capacity up to 1102.3 lb, lifting height 147.6 ft | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_SAKAVO | Mobile screw compressors with electric motor, pressure up to 1 MPa (10 atm), capacity up to 6.5 CY/min | Machine hours | ||||||||||
| DXME-MEVO-KAME_SAKAVO | Electricity: consumption 12.21 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KAME_KARIME | Airless pneumatic spray painting devices powered by mobile compressor units, with a capacity of up to 8.7 l/min | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||