AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KANE-KANE | Ribbed reinforced concrete slabs for roofing and flooring | CY | ||||||||||
| RIME-ME-KAVO-KASA | Control cables | LF | ||||||||||
| RITO-SA-KARI-KARI | Electric welded straight seam steel pipes | LF | ||||||||||
| ME_MEKAKA_TOME | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KAME-KARI_KAKATOME | Bitumen petroleum construction insulation BNI-IV-3, BNI-IV, BNI-V | ton | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-MEKA-KASA_KAKAKAME | Ground coke | ton | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MESA-KASA_KAKAMEME | Hexagonal steel nuts, thread diameter M6 | ton | ||||||||||
| KAME-LI-MESA-MEME_KAKARIRI | Round steel washers, hole diameter M8-12 | lb | ||||||||||
| KARI-ME-KAME-KAME_KAKAKANE | Clay soil (clay) | CY | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | CY | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMERI | Ready-mixed masonry mortar, cement, M50 | CY | ||||||||||
| KASA-ME-KAME-KADX_KAKASARI | Reinforced concrete wall rings for inspection chambers, volume up to 0.9 m3, concrete B15, reinforcement consumption up to 3.12 lb/ft³ | CY | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKALI | Custom-made steel structures from rolled steel | ton | ||||||||||
| KAVO-ME-KARI-KANE_KAKAPUTO | Heavy round cast iron manhole cover, nominal load 250 kN, manhole diameter 23.62 in | EA | ||||||||||
| MEPU-PU-KATO-KAPU_KAKAKAME | Coal tar varnish, grade A | ton | ||||||||||
| RIKA-RI-MEKA-KATO_KAKAKANE | Insulated ring terminals | 100 EA | ||||||||||
| DXME-KAPU-KATO_KAMETO | Trailer-mounted percussion-rope drilling rigs and machines, drilling depth up to 656.2 ft, load capacity 3.2 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKARI | Surface vibrators | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKARI | Electricity: consumption 0.68 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAVO_KAMEME | Clay mixers, capacity 5.2 CY | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAVO_KAMEME | Electricity: consumption 5.94 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKARI | Trucks, load capacity up to 8 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMERI | General purpose semi-trailers, load capacity up to 16.53 ton | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMEME | Mud pumps, capacity 23.4-65.3 m3/h, discharge pressure 15.7-5.88 MPa (160-60 kgf/cm2) | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMEME | Electricity: consumption 18.15 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||