AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MEVO-ME-KADX-KAME | Steel gas ball valves with equal passage | EA | ||||||||||
| RITO-VO-KATO-MERI | Steel flanges | EA | ||||||||||
| RIPU-TO-KASA-KALI | Polyethylene couplings with embedded electric heaters | EA | ||||||||||
| ME_MEKAKA_TOLI | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KALI_KAKAKADX | Rectified technical ethyl alcohol, grade I | lb | ||||||||||
| KAME-LI-MEME-KALI_KAMEVOME | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 2.5 mm | ton | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | lb | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | lb | ||||||||||
| MEVO-PU-KAME-KADX_KAKARIPU | Polyethylene base inlet with free bend for low-pressure polyethylene gas pipeline, with case, with protective coating, diameter 2.48 in | EA | ||||||||||
| RITO-SA-KARI-KARI_KAKATOTO | Electric-welded straight-seam steel pipes made of St2 and 10 steel grades, outer diameter 2.24 in, wall thickness 0.118 in | LF | ||||||||||
| DXME-MEKA-KASA_KAKAPU | Pipe layers, nominal load capacity 6.3 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATODX | Machines for socket welding of plastic pipes with a diameter of up to 7.87 in | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATODX | Electricity: consumption 0.44 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_MESARI | Positioners-centers for assembling and welding polyethylene pipes with a diameter of up to 2.48 in | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||