| KAVO-ME-KASA-KARI | Inlet valves | EA | ||||||||||
| KAVO-ME-KASA-KATO | Galvanized steel pipe for ventilation of the garbage chute shaft | LF | ||||||||||
| KAVO-ME-KASA-KATO | Round ventilation deflector made of galvanized steel | EA | ||||||||||
| KAVO-ME-KASA-KATO | Steel sleeve for the upper end of the waste chute barrel | EA | ||||||||||
| KAVO-ME-KASA-KATO | Steel connecting clamp | EA | ||||||||||
| KAVO-ME-KASA-KATO | Galvanized steel deflector apron | EA | ||||||||||
| KAVO-ME-KASA-KANE | Cleaning, washing, disinfection and fire extinguishing systems | set | ||||||||||
| KAVO-ME-KASA-KALI | Chutes for garbage chutes | LF | ||||||||||
| KAVO-ME-KASA-KAVO | Steel waste chute gate pipe | EA | ||||||||||
| MERI-RI-KASA-MEKA | Thermal insulation boards based on basalt rock | CY | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| KAME-LI-MEDX-KAPU_KAKARIPU | TMKSh technical rubber plates, thickness 0.079-1.575 in | lb | ||||||||||
| KAPU-TO-KARI-KAME_KANEKARI | Cement-based dry self-leveling compounds for leveling floor bases, screeds, layer thickness 0.394-1.181 in, class B20 (M250), manual application | ton | ||||||||||
| KAVO-ME-KASA-KATO_KAKANEME | Galvanized steel pipe for ventilation of garbage chute shaft, outer diameter 11.81 in, steel thickness 0.8 mm | LF | ||||||||||
| KAVO-ME-KASA-KATO_KAKALIME | Steel discharge flange for sandwich-type garbage chute, diameter 24.80 in, height 5.91 in, steel thickness 0.236 in | EA | ||||||||||
| KAVO-ME-KASA-KATO_MEKAMEPU | Steel support flange, inner diameter 17.72 in, flange height 1.97 in, outer pipe diameter 15.43 in | EA | ||||||||||
| MEME-ME-KATO-KANE_KAKALIKA | Edged board of coniferous species, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 0.984 in, grade II | CY | ||||||||||
| MEPU-SA-KAPU-KALI_KAKAMERI | Two-component thiokol mastic for construction purposes, cold curing | lb | ||||||||||
| DXME-KASA-KAME_KAMELI | Tower cranes, lifting capacity 8.82 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMELI | Electricity: consumption 6.83 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electric winches with pulling force up to 31.39 kN (3.2 t) | Machine hours | ||||||||||
| DXME-KANE-KATO_KANERI | Electricity: consumption 0.39 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||