AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PURI | Worker Category 1 | hrs | ||||||||||
| KAME-ME-KARI-KAPU_KAKAMEME | General-purpose asbestos cardboard, KAON-1 brand, thickness 0.118 in | ton | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KASA-MENE_KAKARIRI | Calcium carbide for 50/80 pieces | ton | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KASA-KASA_KAKAKAME | Micanite | lb | ||||||||||
| KAME-LI-KANE-MERI_KAKAKAPU | Tapes made of dense cotton twill fabric, width 1.57 in | 100 LF | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MESA-MEKA_KAKASATO | Metal staples | lb | ||||||||||
| KAME-LI-MELI-MEME_KAKAKARI | Sanding paper | SF | ||||||||||
| KAME-LI-MEDX-KAPU_KAKATOME | Rubber gaskets (pressed technical plate) | lb | ||||||||||
| KAME-LI-RIKA-KAVO_KAKARIME | Fireproof impregnated canvas | SF | ||||||||||
| KAME-LI-RIKA-KAVO_KAMEKARI | Raw mitkal, width 36.22 in, surface density 0.206 oz/SF | 10 LF | ||||||||||
| KAVO-TO-KALI-KAME_KAKASARI | Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 50x0.197 in | ton | ||||||||||
| MEKA-TO-KARI-KATO_KAKAMEME | Tin-lead solder without antimony, grade POS30 | lb | ||||||||||
| MEME-ME-KATO-KASA_KAKANESA | Unedged coniferous boards, natural moisture content, length 2-6.5 m, width 100-250, thickness 1.18-1.97 in, grade III | CY | ||||||||||
| MEPU-PU-KARI-KAPU_KAMEPURI | MA-0115 oil paint, mummy, iron minium | lb | ||||||||||
| RISA-ME-KAME-KAPU_KAKATOME | Coniferous wood sleeper, untreated, for broad gauge railways, type I | EA | ||||||||||
| RISA-ME-KASA-KASA_KAMEKAVO | Railway rails, type P65, category OT350 | LF | ||||||||||
| DXME-KAME-KAME_KATOVO | Bulldozers, power 165 HP (121 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKATO | Hydraulic jacks, lifting capacity 63-110.23 ton | Machine hours | ||||||||||
| DXME-KANE-KATO_KASAVO | Electric winches with a pulling force of 156.96 kN (17.64 ton) | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KASAVO | Electricity: consumption 0.63 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KALI_KAKANE | General-purpose electric hoists, lifting capacity 5.51 ton | Machine hours | ||||||||||
| DXME-KANE-KALI_KAKANE | Electricity: consumption 0.28 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MESA-KATO_KAMEPU | Pneumatic-tired tractors, power 80 HP (59 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAKALI | Pumps, capacity 7.2 m3/h, head 85.3 ft, power 5.5 kW | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAKALI | Electricity: consumption 1.82 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-MEKA_KATOME | Hydraulic pump stations for driving hydraulic jacks, pressure up to 10 MPa | Machine hours | ||||||||||
| DXME-MEDX-MEKA_KATOME | Electricity: consumption 1.82 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MENE_KAKAME | Combined electric press shears, nominal force 630 kN, power 7 HP (5 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MENE_KAKAME | Electricity: consumption 1.58 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MENE_KAMERI | Hydraulic presses with electric drive | Machine hours | ||||||||||
| DXME-RIME-MENE_KAMERI | Electricity: consumption 0.25 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||