AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-NE-KAME-MEME | Fiber cement panels | SF | ||||||||||
| KAME-LI-MESA-KALI | Dowels | EA | ||||||||||
| KAME-LI-MESA-KAVO | Rivets | 100 EA | ||||||||||
| KAME-LI-MELI-KANE | Cutting discs | EA | ||||||||||
| KAME-LI-MELI-KADX | Drill bits, drill bits | EA | ||||||||||
| KALI-RI-KANE-KAME | Brackets for facing construction | set | ||||||||||
| KALI-RI-KANE-KATO | Sub-facing construction profiles | LF | ||||||||||
| KAVO-TO-KASA-KAPU | Fire barrier | SF | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | CY | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KANE-MEME_MEKAKARI | Synthetic rubber-based sealing strips for ventilated curtain walls, thickness 0.039 in, width 1.42 in | 10 LF | ||||||||||
| KAME-LI-KANE-MEME_MEKAKAPU | Synthetic rubber-based sealing strips for ventilated curtain walls, thickness 0.039 in, width 2.36 in | 10 LF | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KADX_SAVOME | Self-lifting two-seater cradles, load capacity 1388.9 lb | Machine hours | ||||||||||
| DXME-KANE-KADX_SAVOME | Electricity: consumption 0.99 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||