| KAPU-RI-KAME-KAME | Asphalt concrete mixes | ton | ||||||||||
| ME_MEKAKA_RIDX | Average work load 2.9 | hrs | ||||||||||
| KAME-RI-KATO-KALI_KAKARITO | Bitumen road emulsion | ton | ||||||||||
| KAME-TO-KAME-KANE_KAKASAME | Grease, solid, fat-based, type Z | lb | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MESA-KANE_KAMERIRI | Steel construction nails, diameter 1.8 mm, length 1.97-2.36 in | ton | ||||||||||
| KAVO-PU-KATO-KARI_KAKAKARI | Hot-rolled smooth reinforcing steel, class A-I, diameter 0.236-0.866 in | ton | ||||||||||
| MEME-ME-KATO-KAME_KAKANERI | Edged softwood beams (spruce, pine), natural moisture content, length 2-6.5 m, width 0.787-3.543 in, thickness 0.787-3.543 in, grade II | CY | ||||||||||
| MEME-ME-KATO-KASA_KAKANESA | Unedged coniferous boards, natural moisture content, length 2-6.5 m, width 100-250, thickness 1.18-1.97 in, grade III | CY | ||||||||||
| DXME-KASA-METO_KAKAME | Flatbed trucks, load capacity up to 6 tons, with crane-manipulator, load capacity 4 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 2.6 m3, load capacity 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KARI_KAKARI | Auto asphalt spreaders, tank capacity 7000 l | Machine hours | ||||||||||
| PU_MEKAKA_KAPUSA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KARI_KAMEME | Hand-held asphalt spreaders | Machine hours | ||||||||||
| DXME-KAVO-KATO_KAKADX | Self-propelled smooth vibratory rollers, weight 2.2 t | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KADX_KARISA | Electric tampers | Machine hours | ||||||||||
| DXME-KAVO-KADX_KARISA | Electricity: consumption 0.73 kWh/machine-hour | Machine hours | ||||||||||
| DXME-METO-KAME_KATOVO | Watering machines, tank capacity 7.8 CY | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KATO_KAKAPU | Dump trucks, load capacity up to 30 tons | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKARI | Mobile screw compressors with internal combustion engines, pressure up to 1.3 MPa (13 atm), capacity up to 15.7 CY/min | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KARIME | Rebar bending machines | Machine hours | ||||||||||
| DXME-RIME-MEDX_KARIME | Electricity: consumption 0.99 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATODX | Electrohydraulic shears for cutting reinforcement bars, power 1.2 kW | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATODX | Electricity: consumption 0.38 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||