| KAME-RI-KAME-KAME | Bitumen | ton | ||||||||||
| KAVO-PU-KARI-KANE | Cold-drawn wire mesh | ton | ||||||||||
| MERI-RI-KATO-MEME | Glass fabric | 100 SF | ||||||||||
| ME_MEKAKA_TOPU | Worker Category 1 | hrs | ||||||||||
| KAME-ME-KARI-MEKA_MEKARIRI | Chrysotile (chrysotile asbestos), group 6K, grades 6K-45, 6K-30, 6K-20, 6K-5 | ton | ||||||||||
| KAME-RI-KATO-KATO_KAMEKALI | Bitumen-oil mastic MB-50 | ton | ||||||||||
| KAME-TO-KAME-KAVO_KAKAKAME | Diesel fuel | ton | ||||||||||
| KAME-TO-KAPU-KATO_KAKAKATO | Industrial oil I-20A | gal | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMESA | Ready-mixed masonry mortar, cement, M150 | CY | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKALI | Custom-made steel structures from rolled steel | ton | ||||||||||
| KAVO-ME-KARI-KAME_KAKAPUKA | Cast iron square drain funnel with a grid measuring 270x290x1.97 in, funnel dimensions 350x330x6.50 in, outer diameter of the cup 6.06 in | EA | ||||||||||
| MEPU-PU-KATO-KATO_KAKAKARI | BT-123 bitumen varnish | ton | ||||||||||
| RITO-NE-KAME-KAME_KAKAKATO | Cast iron sewer pipes, length 6.56 ft, nominal diameter 5.91 in, wall thickness 0.197 in | LF | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 27.56 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKARI | Surface vibrators | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKARI | Electricity: consumption 0.68 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Electricity: consumption 5.94 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|