| KARI-RI-KASA-KAPU | Crushed stone | CY | ||||||||||
| KASA-ME-KASA-METO | Reinforced concrete foundations for contact network supports | EA | ||||||||||
| ME_MEKAKA_RIDX | Average work load 2.9 | hrs | ||||||||||
| KAME-RI-KAME-KARI_KAKASAPU | BN-90/10 petroleum bitumen for construction | ton | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length 3-6.5 m, diameter 14-24 cm, grade II-III | CY | ||||||||||
| MEME-ME-KATO-KAME_KAKANEVO | Edged softwood timber (spruce, pine), natural moisture content, length 2-6.5 m, width 3.94 in and above, thickness 3.94 in and above, grade IV | CY | ||||||||||
| MEME-ME-KATO-KASA_KAKANENE | Unedged softwood boards, natural moisture content, length 2-6.5 m, width 100-250, thickness 1.18-1.97 in, grade IV | CY | ||||||||||
| DXME-KAME-KAME_KATOSA | Bulldozers, power 108 HP (79 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAME-KASA_KAVOSA | Single-bucket diesel excavators on crawler tracks, bucket capacity 0.5 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KALI_KAKARI | Railway cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KARIPU | 20-ton wide gauge railcars | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-KADX-KASA_KARIRI | Broad gauge shunting locomotives, power 750 HP (550 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||