AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAVO-ME-KARI-RISA | Caisson | ton | ||||||||||
| KAVO-PU-KAME-KAME | Anchors | EA | ||||||||||
| ME_MEKAKA_PUTO | Worker Category 1 | hrs | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KALI_KAKALI | General-purpose electric hoists, lifting capacity 11.02 ton | Machine hours | ||||||||||
| DXME-KANE-KALI_KAKALI | Electricity: consumption 0.3 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAMERI | Mobile screw compressors with electric motor, pressure up to 0.6 MPa (6 atm), capacity up to 3.5 m3/min | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAMERI | Electricity: consumption 6.11 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAKASA | Submersible slurry pumps, capacity 65.4 CY/h, head up to 164.0 ft | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAKASA | Electricity: consumption 4.29 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMEKA | Submersible slurry pumps, capacity 784.8 CY/h, head up to 32.8 ft | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMEKA | Electricity: consumption 14.85 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KANE_KAKARI | Tugboats, power 130 HP (96 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-METO_KAKAME | Diving stations on a self-propelled boat, power 150 HP (110 kW) with compressor | Machine hours | ||||||||||
| PU_MEKAKA_KANEVO | Personnel: 6 people-hours/machine-hours | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||