Quick Facts
Total Cost
0
Workers/Unit
h
Labor Hours
0
Resources
0
Machines
0
Steps
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MEME-ME-KAME-METO | Solid parquet | SF | ||||||||||
| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KATO-KATO_KAMESAPU | Bitumen-cork waterproofing mastic, roofing, consumption 0.410 lb/SF with a layer thickness of 1.0 mm | ton | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KALI-RIDX_KAKADXME | Wood shavings | CY | ||||||||||
| MEPU-SA-KAPU-KATO_KAMEKAPU | KN-2 rubber adhesive mastic | lb | ||||||||||
| DXME-KANE-KANE_KAPUVO | Single-mast hoists, load capacity up to 1102.3 lb, lifting height 147.6 ft | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KALI_KAKAME | Machines for sharpening wooden floors | Machine hours | ||||||||||
| DXME-RIME-KALI_KAKAME | Electricity: consumption 0.73 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KALI_KAKARI | Parquet sanding machines | Machine hours | ||||||||||
| DXME-RIME-KALI_KAKARI | Electricity: consumption 0.73 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||