Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-KALI-MEPU | Compensators made of physically cross-linked polyethylene foam | 100 EA | ||||||||||
| KAPU-ME-KARI-KASA | Heavy concrete mixes | CY | ||||||||||
| METO-RI-KATO-KARI | Rock curbs made of rock | LF | ||||||||||
| ME_MEKAKA_RILI | Worker Category 1 | hrs | ||||||||||
| MEME-ME-KATO-KAME_KAKAKAME | Planed softwood bars (pine, spruce), dimensions 50x1.97 in, grade AB | CY | ||||||||||
| MEME-ME-KATO-KANE_KAKALIKA | Edged board of coniferous species, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 0.984 in, grade II | CY | ||||||||||
| DXME-KASA-METO_KAMESA | Sideboard trucks, load capacity up to 12 tons, with crane-manipulator, load capacity 1.5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KANEKA | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 0.46 m3, load capacity 1.10 ton | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KADX_SAKARI | Gasoline vibratory rammers, power up to 5 HP (4 kW) | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||