AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| KAME-ME-KARI-MEKA_MEKAMEPU | Chrysotile (chrysotile asbestos), group 3, grades 3-75, 3-70, 3-60, 3-50 | ton | ||||||||||
| KAME-RI-KAME-KARI_KAKAPUME | Bitumen petroleum construction roofing BNK-45/190, BNK-40/180 | ton | ||||||||||
| KAME-TO-KAME-KATO_KAKAKARI | Kerosene for technical purposes | ton | ||||||||||
| KAME-LI-KALI-RIKA_KAKAKARI | Ground talc, grade I | ton | ||||||||||
| MEME-ME-KAME-MENE_KAKAKARI | Wooden blocks for parquet flooring, impregnated with oil-based antiseptics, types 1 and 2, height 60 and 3.15 in | CY | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Electricity: consumption 5.94 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KALI_KAKAME | Machines for sharpening wooden floors | Machine hours | ||||||||||
| DXME-RIME-KALI_KAKAME | Electricity: consumption 0.73 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||