| KAME-RI-KATO-KASA | Primer | lb | ||||||||||
| KAME-LI-MERI-KASA | Non-woven geotextiles | SF | ||||||||||
| KARI-RI-KAME-KARI | Gravel | CY | ||||||||||
| KARI-TO-KAME-KARI | Natural sand for construction work | CY | ||||||||||
| KAPU-ME-KARI-KASA | Heavy concrete mixes | CY | ||||||||||
| KAPU-TO-KAME-KADX | Ready-mixed cement mortar | CY | ||||||||||
| KAVO-PU-KARI-KATO | Rebar blanks | ton | ||||||||||
| MERI-ME-KARI-MESA | Rolled waterproofing materials | SF | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | lb | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MESA-KATO_KAKAMESA | Steel bolts with hexagonal heads, complete with hexagonal nuts and flat round washers, thread diameter M20 (M22), bolt length 1.57-8.66 in | ton | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| KAVO-TO-KAVO-KARI_KAKAPUSA | Hot-rolled steel angle bar with equal flanges, steel grades St3sp, St3ps, flange width 2.48-3.94 in, flange thickness 0.157-0.630 in | ton | ||||||||||
| MEME-ME-KATO-KAME_KAKANETO | Edged coniferous timber (spruce, pine), natural moisture content, length 2-6.5 m, width 0.787-3.543 in, thickness 0.787-3.543 in, grade III | CY | ||||||||||
| MEME-ME-KATO-KASA_KAKANESA | Unedged coniferous boards, natural moisture content, length 2-6.5 m, width 100-250, thickness 1.18-1.97 in, grade III | CY | ||||||||||
| MEME-ME-KATO-KANE_KAKALIDX | Edged softwood boards, natural moisture content, length 2-6.5 m, width 3.94-9.84 in, thickness 1.73-1.97 in, grade III | CY | ||||||||||
| RIPU-RI-KATO-KAME_KAKAKAME | Concrete pipe lock, diameter 4.92 in | EA | ||||||||||
| RIPU-RI-KATO-KAME_KARIKAME | Steel concrete pipe section for feeding concrete mix, inner diameter 4.92 in, wall thickness 4.5 mm, length 118.11 in | EA | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KARI_KARIME | Trailer-mounted electric concrete pumps, capacity 78.5 CY/h | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KARI_KARIME | Electricity: consumption 24.75 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKARI | Surface vibrators | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKARI | Electricity: consumption 0.68 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KALI-MEKA_KAMEME | Mortar pumps with electric motor, capacity 5.2 CY/h, horizontal delivery range 656.2 ft, vertical delivery range 196.9 ft | Machine hours | ||||||||||
| DXME-KALI-MEKA_KAMEME | Electricity: consumption 2.48 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEKA_KAKAME | Pneumatic jackhammers for use with stationary compressor stations | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||