AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-RI-KATO-KASA | Primer | lb | ||||||||||
| ME_MEKAKA_RINE | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | lb | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMESA | Ready-mixed masonry mortar, cement, M150 | CY | ||||||||||
| MERI-ME-KARI-MESA_KAKADXTO | Rolled bitumen-polymer waterproofing material for waterproofing reinforced concrete slabs of bridge structures and roads, weldable, polyester fabric base, flexibility not lower than -25 °C, weight 10.8 SF-SA.SA kg, strength not less than 600 N, heat resistance not less than 100 °C | SF | ||||||||||
| MEPU-RI-KASA-KANE_KAKAKAME | Polymer-cement composition | CY | ||||||||||
| DXME-MELI-KAPU_KADXME | Gas injection burners | Machine hours | ||||||||||
| DXME-RIME-RIRI_NETOVO | Industrial vacuum cleaners, power up to 2000 W | Machine hours | ||||||||||
| DXME-RIME-RIRI_NETOVO | Electricity: consumption 0.66 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||