AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KASA-ME-KAME-METO | Precast reinforced concrete slabs for carpet | CY | ||||||||||
| MEVO-ME-KATO-KAME | Hydraulic valves | EA | ||||||||||
| MEVO-SA-KALI-KAPU | Condensate drain pipe | set | ||||||||||
| MEVO-SA-KAVO-KAPU | Carpet | EA | ||||||||||
| MEVO-SA-METO-KAME | Large-scale mounting assemblies | LF | ||||||||||
| ME_MEKAKA_TOSA | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KAME-KARI_KAKASAPU | BN-90/10 petroleum bitumen for construction | ton | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | lb | ||||||||||
| KAME-SA-KATO-KATO_KAKADXME | Index | EA | ||||||||||
| KAME-LI-KALI-RIDX_KAMEMEME | Resin-impregnated tow | lb | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KARI-TO-KAME-KARI_MEMEMEVO | Natural sand for construction works, class II, medium | CY | ||||||||||
| KAPU-ME-KARI-KASA_KAMERIRI | Heavy concrete mixes (BST) on gravel aggregate, class B12.5, F(1)75, W2 | CY | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMERI | Ready-mixed masonry mortar, cement, M50 | CY | ||||||||||
| RITO-TO-KANE-KASA_KAKARITO | Non-galvanized welded steel pipes for water and gas supply without threads, ordinary, nominal diameter 3.54 in, wall thickness 0.157 in | LF | ||||||||||
| RIPU-RI-KASA-KAME_KAKAKAME | Non-pressure chrysotile cement pipes, nominal diameter 3.94 in | LF | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||