AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KALI-RI-KALI-METO | Steel structures | ton | ||||||||||
| ME_MEKAKA_SASA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KAME_KAKAKAME | B-70 aviation gasoline | ton | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | lb | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MEME-KALI_KARITOKA | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MEME-KALI_KARIPUNE | Welding electrodes for welding heat-resistant austenitic and high-strength structural steels EA-395, diameter 0.079-0.197 in | lb | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | lb | ||||||||||
| KAME-LI-MELI-KANE_KAKADXRI | Flat cutting disc, dimensions 230x3x0.866 in | EA | ||||||||||
| KAME-LI-MELI-KALI_KAKASAPU | Straight profile grinding wheel, dimensions 230x5x0.866 in | EA | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | lb | ||||||||||
| KALI-RI-KALI-KAPU_KAKAKALI | Custom-made steel structures from rolled steel | ton | ||||||||||
| KAVO-TO-KAME-KARI_KAKAPUNE | I-beams with parallel flange edges, steel grades St3sp, St3ps, No. 20Sh-50Sh | ton | ||||||||||
| KAVO-TO-KASA-KARI_KAKALISA | Hot-rolled sheet steel, steel grades St3sp, St3ps, width 47.24-118.11 in, thickness 0.984-2.362 in | ton | ||||||||||
| KAVO-TO-KASA-KARI_KAMEKARI | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 47.24-118.11 in, thickness 0.551-0.945 in | ton | ||||||||||
| KAVO-TO-KAVO-KARI_KAKAKAPU | Hot-rolled steel angle bar, steel grades St3sp, St3ps, shelf width 7.09-7.87 in, shelf thickness 0.433-1.181 in | ton | ||||||||||
| MEME-ME-KATO-KAME_KAKANERI | Edged softwood beams (spruce, pine), natural moisture content, length 2-6.5 m, width 0.787-3.543 in, thickness 0.787-3.543 in, grade II | CY | ||||||||||
| MEPU-PU-KAME-KAME_KAKAKATO | GF-021 primer | ton | ||||||||||
| RISA-ME-KAME-KASA_KAKAMERI | Sleepers made of coniferous wood, impregnated, for broad gauge railways, type II | EA | ||||||||||
| DXME-KASA-KARI_KAMEKA | Gantry cranes, lifting capacity 275.58 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAMEKA | Electricity: consumption 157.08 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMELI | Mobile cranes, lifting capacity 44.09 ton | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKARI | Hydraulic jacks, lifting capacity 6.3-25 t | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKATO | Hydraulic jacks, lifting capacity 63-110.23 ton | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKAPU | Hydraulic jacks, load capacity 220.46 ton | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKATO | Tractor units, load on the fifth wheel coupling up to 33.07 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAKARI | Heavy-duty semi-trailers, load capacity up to 44.09 ton | Machine hours | ||||||||||
| DXME-MELI-KAME_KAKAPU | Welding rectifiers, welding current up to 500 A, number of posts 1 | Machine hours | ||||||||||
| DXME-MELI-KAME_KAKAPU | Electricity: consumption 7.92 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAMERI | Mobile screw compressors with electric motor, pressure up to 0.6 MPa (6 atm), capacity up to 3.5 m3/min | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAMERI | Electricity: consumption 6.11 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||