AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MELI-KANE | Diamond cutting disc | EA | ||||||||||
| KARI-TO-KAME-KARI | Sand | CY | ||||||||||
| KAPU-ME-KARI-KASA | Heavy concrete mixes | CY | ||||||||||
| METO-RI-KATO-KARI | Sawn granite curbstones | LF | ||||||||||
| ME_MEKAKA_RILI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KATO-RI-KAME-KAME_KAKAKAME | Portland cement without additives for general construction CEM 0 32.5N | ton | ||||||||||
| DXME-KANE-KASA_KAPUME | Telescopic loaders, lifting capacity up to 3.31 ton, lifting height up to 52.5 ft | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KASADX | Single-bucket universal front pneumatic wheel loaders, nominal capacity of the main bucket 2.3 m3, load capacity 4.41 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KATO_KAKAVO | Mobile gravity concrete mixers, drum capacity 250 l | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KATO_KAKAVO | Electricity: consumption 0.5 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAPU | Flatbed trucks, load capacity up to 16.53 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MESA_KAKAME | Petrol cutters, engine power 4 HP (3 kW) | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||