Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-NE-KAME-KARI | Plasterboard sheets | SF | ||||||||||
| MEME-ME-KATO-KAME | Edged coniferous timber (spruce, pine), natural moisture content, length 2-6.5 m, width 0.787-3.543 in, thickness 0.787-3.543 in | CY | ||||||||||
| ME_MEKAKA_TOTO | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KASA-RITO_KAMERIDX | Technical sodium fluoride, grade A, type I | ton | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KAME-LI-KALI-KAPU_KAKAKASA | Polyvinyl acetate homopolymer dispersion, coarse-dispersed, unplasticized D50N | lb | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| KAME-LI-MEDX-KAPU_KAKATOME | Rubber gaskets (pressed technical plate) | lb | ||||||||||
| KAME-LI-RIKA-KAVO_KAMEKARI | Raw mitkal, width 36.22 in, surface density 0.206 oz/SF | 10 LF | ||||||||||
| MERI-RI-KASA-KASA_KAKAKAPU | Mineral wool slabs with synthetic binder, thermal insulation PZ-120, rigid, density 111-8.12 lb/ft³ | CY | ||||||||||
| MEPU-ME-KAPU-KARI_KAKAMEME | Adhesive, grade 88-H | lb | ||||||||||
| MEPU-SA-KAPU-KARI_KAKAKARI | KN-3 rubber adhesive mastic | ton | ||||||||||
| MEPU-SA-MEME-KATO_KAKAKARI | Dry moisture-resistant gypsum-based putty mixtures with polymer and hydrophobic additives, aggregate size no more than 0.2 mm, flexural strength not less than 1.5 MPa | lb | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||