| KAME-TO-KASA-TOVO | Chemical reagents | ton | ||||||||||
| KAME-PU-KATO-KANE | Drilling tool consumption | set | ||||||||||
| KAPU-ME-KARI-KASA | Heavy concrete mixes | CY | ||||||||||
| KAVO-PU-KARI-KATO | Reinforcing frames | ton | ||||||||||
| ME_MEKAKA_TOVO | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KARI-ME-KAME-KAME_KAKAKANE | Clay soil (clay) | CY | ||||||||||
| KATO-RI-KAME-KAME_KAKAKAME | Portland cement without additives for general construction CEM 0 32.5N | ton | ||||||||||
| KAVO-TO-KATO-KANE_KAKAKARI | Hot-rolled wire in coils, diameter 6.3-6.5 mm | ton | ||||||||||
| MEME-ME-KATO-KAME_KAKANELI | Edged softwood timber (spruce, pine), natural moisture content, length 2-6.5 m, width 3.94 in and above, thickness 3.94 in and above, grade III | CY | ||||||||||
| RITO-TO-KAME-KAPU_KAKALIME | Seamless casing pipes made of Group D steel, with short triangular thread, outer diameter 14.84 in, wall thickness 0.354-0.472 in | ton | ||||||||||
| DXME-KAME-KASA_KAVOPU | Single-bucket diesel excavators on crawler tracks, bucket capacity 0.4 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KARI-KAPU_KARIME | Installation for the construction of bored piles based on an excavator with a bucket capacity of 2.5 m3 for drilling wells with a diameter of up to 1.7 m | Machine hours | ||||||||||
| PU_MEKAKA_KASATO | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-KARI-KAPU_KARIME | Electricity: consumption 29.7 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KANE_KAKALI | Crawler cranes, lifting capacity 27.56 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAPU_KAKAME | Deep vibrators | Machine hours | ||||||||||
| DXME-KALI-KAVO_KAMEME | Clay mixers, capacity 5.2 CY | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAVO_KAMEME | Electricity: consumption 5.94 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMEME | Mud pumps, capacity 23.4-65.3 m3/h, discharge pressure 15.7-5.88 MPa (160-60 kgf/cm2) | Machine hours | ||||||||||
| DXME-MEDX-KANE_KAMEME | Electricity: consumption 18.15 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAKADX | Pumps, capacity 65.4 CY/h, head 105.0 ft, power 11 HP (8 kW) | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAKADX | Electricity: consumption 2.64 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||