Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-PU-KATO-KANE | Drilling tool consumption | set | ||||||||||
| KAPU-TO-KARI-KAPU | Ready-to-use concrete mixes | CY | ||||||||||
| KAVO-PU-KARI-KATO | Reinforcing frames | ton | ||||||||||
| ME_MEKAKA_TOSA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEME-KALI_KARITOKA | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 0.157-0.197 in | lb | ||||||||||
| DXME-KARI-KAME_KAKATO | High-frequency electric vibratory pile drivers for driving piles up to 1.5 t, eccentric moment 47 kgm, centrifugal force 450 kN | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KARI-KAME_KAKATO | Electricity: consumption 19.8 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KARI-KAPU_KAPUME | Crawler-mounted drilling rigs for drilling wells, diameter when drilling with casing pipes up to 90.55 in, depth up to 150.9 ft, torque 250-350 kNm | Machine hours | ||||||||||
| PU_MEKAKA_KAVOSA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KASANE | Single-bucket universal front pneumatic wheel loaders, nominal capacity of main bucket 1.1 m3, load capacity 2.20 ton | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KARI_KAMEME | Concrete pumps, capacity 85.0 CY/h | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAME_KAKATO | Concrete mixer trucks, drum capacity 7.8 CY | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKAME | Tractor units, load on the fifth wheel coupling up to 13.23 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAMERI | General purpose semi-trailers, load capacity up to 16.53 ton | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||