AI
Workers
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RI_MEKAKA_KAME | Grade 1 worker | hrs | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | lb | ||||||||||
| KASA-ME-KAVO-KANE_KAMEMEPU | Reinforced concrete slabs for transport infrastructure construction, volume up to 1.4 m3, concrete B15, reinforcement consumption from 50 to 6.24 lb/ft³ | CY | ||||||||||
| KASA-ME-KAVO-KANE_KAMEMESA | Reinforced concrete wall panels for transport infrastructure construction, volume up to 0.8 m3, B15 concrete, reinforcement consumption from 50 to 6.24 lb/ft³ | CY | ||||||||||
| KASA-ME-KAVO-MEPU_KAMEVORI | Reinforced concrete half-rings, volume up to 0.5 m3, concrete B15, reinforcement consumption from 100 to 9.36 lb/ft³ | CY | ||||||||||
| MEPU-PU-KAME-KAME_KAKAKATO | GF-021 primer | ton | ||||||||||
| MEPU-PU-KARI-KADX_KATOKARI | BT-177 paint | ton | ||||||||||
| MEPU-SA-KADX-MEME_KAMEKARI | White spirit | lb | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_SAPUPU | Portable gasoline generators, power up to 8 HP (6 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||