Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KARI-RI-KASA-KAPU | Natural stone crushed stone for construction work | CY | ||||||||||
| KARI-TO-KAME-KARI | Sand, crushed stone | CY | ||||||||||
| KASA-ME-KAME-MEKA | Precast reinforced concrete structures | CY | ||||||||||
| ME_MEKAKA_TOME | Worker Category 1 | hrs | ||||||||||
| KAME-RI-KATO-KATO_KAMEKALI | Bitumen-oil mastic MB-50 | ton | ||||||||||
| KAME-TO-KAME-KAVO_KAKAKAME | Diesel fuel | ton | ||||||||||
| KAME-LI-KALI-RIDX_KAMEMEME | Resin-impregnated tow | lb | ||||||||||
| KAPU-TO-KAME-KADX_KAKAMESA | Ready-mixed masonry mortar, cement, M150 | CY | ||||||||||
| MEPU-PU-KATO-KATO_KAKAKARI | BT-123 bitumen varnish | ton | ||||||||||
| DXME-KAME-KASA_MEKANE | Single-bucket diesel excavators on pneumatic wheels, bucket capacity 0.25 m3 | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KAMEME | Universal front-end pneumatic wheeled single-bucket loaders, nominal capacity of main bucket 2.6 m3, load capacity 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Mobile electric bitumen boilers with centrifugal mixer, loading capacity 400 l | Machine hours | ||||||||||
| DXME-KAVO-KAPU_KARIME | Electricity: consumption 5.94 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-KADX-KAPU_KAKAME | Wide-gauge freight crane draisines, universal, crane lifting capacity 1.10 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KASA_KARITO | Broad gauge shunting locomotives, power 1200 HP (880 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||