AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KARI-ME-KAME-KARI | Soil | CY | ||||||||||
| KASA-ME-KARI-KALI | Reinforced concrete support stand | EA | ||||||||||
| RISA-ME-KAME-KAME | Bars for fastening high-voltage circuit crossarms | CY | ||||||||||
| RISA-RI-KAME-KALI | High-voltage pin insulators | 100 EA | ||||||||||
| ME_MEKAKA_TOSA | Worker Category 1 | hrs | ||||||||||
| KAVO-TO-KAPU-KARI_KAKANETO | Hot-rolled round steel bars, steel grades St3sp, St3ps, diameter 0.197-0.472 in | ton | ||||||||||
| MEME-ME-KARI-KATO_KAKAKATO | Softwood poles, length 3-6.5 m, thickness 3-5 cm | CY | ||||||||||
| MEME-ME-KARI-KAPU_KAKAKARI | Round coniferous timber (spruce, pine, fir) unpeeled, length 8.5-13 m, diameter 16-24 cm, grade I-III | CY | ||||||||||
| MEPU-SA-KASA-KAME_KAKAMERI | Combined drying oil for diluting thick oil paints and for exterior work on wooden surfaces | ton | ||||||||||
| RIKA-RI-KARI-KAPU_KAKAKANE | K-6 polyethylene caps | 100 EA | ||||||||||
| RISA-ME-KAME-KAME_KAKAMEME | Wooden crossbar impregnated with antiseptic, type T-6, cross-section 100x4.72 in | CY | ||||||||||
| RISA-RI-KARI-KAME_KAKAMEME | Special bolts for fastening with nut and washer, diameter 0.472-0.630 in, length 15.75 in | ton | ||||||||||
| DXME-KAPU-KAME_KATORI | Drilling and crane machines based on a crawler tractor with a power of 95 HP (70 kW), drilling depth up to 9.84 ft, hole diameter up to 31.50 in | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-KADX-KAPU_KAKARI | Wide-gauge freight crane draisines, crane capacity 3.5 t | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||