| KALI-RI-KALI-METO | Reinforcement blocks | ton | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| RI_MEKAKA_KAME | Grade 1 worker | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | lb | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| DXME-KASA-KAME_KARIKA | Tower cranes, lifting capacity 27.56 ton | Machine hours | ||||||||||
| PU_MEKAKA_KAVOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KARIKA | Electricity: consumption 12.24 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKATO | Gantry cranes, load capacity 12.5 t | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KARI_KAKATO | Electricity: consumption 17.42 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAME_KAKARI | Hydraulic jacks, lifting capacity 6.3-25 t | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KAPU_KAKAME | Tractor units, load on the fifth wheel coupling up to 13.23 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KASA_KAKAME | Heavy-duty semi-trailers, load capacity up to 22.05 ton | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||