| KAME-SA-KATO-KAVO | Metal traffic light bridge structures | ton | ||||||||||
| KALI-RI-KALI-METO | Rigid steel crossbars | ton | ||||||||||
| ME_MEKAKA_TOLI | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEME-KALI_KAKARIME | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.079 in | ton | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | lb | ||||||||||
| RISA-RI-KAME-METO_KAKAKASA | Steel fastening cap on reinforced concrete supports, type OG-1 | EA | ||||||||||
| RISA-RI-KARI-KAME_KAKAMEME | Special bolts for fastening with nut and washer, diameter 0.472-0.630 in, length 15.75 in | ton | ||||||||||
| DXME-KASA-KALI_KAKARI | Railway cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KARIPU | 20-ton wide gauge railcars | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-KADX-KASA_KARIRI | Broad gauge shunting locomotives, power 750 HP (550 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOPU | Welding units with internal combustion engines for manual arc welding, welding current up to 400 A, number of stations 1 | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||