AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RILI-RI-KAME-KASA | Suspensions | EA | ||||||||||
| RILI-RI-KARI-KARI | String insulators | EA | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-TO-KARI-KATO_KAKAKAME | Acetylene gas, technical grade | CY | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAVO-TO-KAME-KARI_KAKARIPU | I-beams with parallel flanges, steel grades St3sp, St3ps, No. 10B-18B | ton | ||||||||||
| KAVO-TO-KATO-KASA_KAKAMEVO | Low-carbon galvanized steel wire for various purposes, diameter 4.0 mm | ton | ||||||||||
| KAVO-TO-KATO-KASA_MEKANEVO | General-purpose low-carbon galvanized steel wire, diameter 7.0-10.0 mm | ton | ||||||||||
| KAVO-TO-KASA-KARI_KAKARIME | Hot-rolled sheet metal, steel grades St3sp, St3ps, width 47.24-118.11 in, thickness 0.039-0.315 in | ton | ||||||||||
| KAVO-TO-KALI-KAME_KAKASALI | Hot-rolled steel strip, steel grades St3sp, St3ps, dimensions 80x0.197 in | ton | ||||||||||
| RIKA-RI-KAVO-KALI_KAKAMERI | KS-162 cable fastening bracket | EA | ||||||||||
| RIME-RI-KAME-KARI_MEKAKAKA | MF 100 copper shaped contact wire | 1000 LF | ||||||||||
| RISA-RI-KAME-KANE_KAKAKARI | KS-035 wedge clamp for earrings with wedge | EA | ||||||||||
| RISA-RI-KAME-MERI_KAKAKASA | Tension coupling with eye KS-143 | EA | ||||||||||
| RILI-RI-KAME-KATO_KAKAMERI | ZKK wedge end clamp for tram and trolleybus contact networks (for MF-85 wire) | EA | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KAPUDX | Manual and lever winches with a pulling force of up to 9.81 kN (1.10 ton) | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOPU | Narrow gauge platforms | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Drilling machines | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Electricity: consumption 0.45 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||