AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-MESA-KAVO | Fastening elements for flashings and framing parts (self-tapping screws, rivets, etc.) | ton | ||||||||||
| KADX-PU-KATO-KASA | Aluminum alloy window blocks | ton | ||||||||||
| KADX-PU-KATO-MEME | Aluminum alloy window sills and framing parts | ton | ||||||||||
| ME_MEKAKA_TOSA | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | lb | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KAKATONE | Welding electrodes for welding low-alloy and carbon steels E46, diameter 0.157 in | lb | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | lb | ||||||||||
| KAME-LI-MESA-KANE_KAMEMEME | Construction nails | ton | ||||||||||
| KAME-LI-RIKA-KAVO_KAKALIME | Hemp rope, twisted, impregnated, diameter 1.02 in | ton | ||||||||||
| KAVO-RI-KARI-MEME_KAKAKALI | Double twisted rope TK, construction 6x19(1+6+12)+1 o.s., grade B, made of galvanized wire group G, marking group 1570-1770 N/mm2, diameter 5.5 mm | 10 LF | ||||||||||
| KAVO-TO-KATO-KANE_KAKAKARI | Hot-rolled wire in coils, diameter 6.3-6.5 mm | ton | ||||||||||
| KAVO-TO-MEME-KAME_MEMEKANE | Hot-rolled steel channels, steel grades St3ps, St3sp, No. 40U, No. 40P | ton | ||||||||||
| MEPU-PU-KAME-KAME_KAKAKATO | GF-021 primer | ton | ||||||||||
| MEPU-SA-KADX-KALI_KAKATOKA | Solvent P-4 | ton | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAVO_KAKALI | Pneumatic wheeled cranes, lifting capacity 33.07 ton | Machine hours | ||||||||||
| PU_MEKAKA_KALIKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MELI-KAPU_MELIME | Welding machines for manual arc welding, welding current up to 500 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_MELIME | Electricity: consumption 7.92 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||