AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MERI-RI-KAPU-MERI | Mineral wool mattresses on glass fabric | CY | ||||||||||
| ME_MEKAKA_SAKA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MESA-KAVO_KAKAMEME | Combined rivets for connecting profiled steel decking and various sheet metal parts | ton | ||||||||||
| KAME-LI-MESA-MEPU_KATOKAPU | Self-tapping galvanized steel screws with a semi-circular head and cross-shaped slot, pointed, diameter 0.157 in, length 0.472 in | ton | ||||||||||
| KAVO-TO-KARI-KAME_KAKAPUME | Steel packaging tape, soft, normal precision in thickness and width 0.7x0.787-1.969 in | ton | ||||||||||
| KAVO-TO-KATO-KASA_KAKAMEME | Low-carbon galvanized steel wire for various purposes, diameter 1.1 mm | ton | ||||||||||
| KAVO-TO-KATO-KASA_KAKAMELI | Low-carbon galvanized steel wire for various purposes, diameter 3.0 mm | ton | ||||||||||
| KAVO-TO-KASA-KASA_KAKASAVO | Galvanized sheet steel, thickness 1.0 mm | ton | ||||||||||
| KAVO-TO-KASA-KASA_KAKASADX | Galvanized sheet steel, thickness 1.5 mm | ton | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUPUME | Equipment for the preparation of protective thermal insulation coatings | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUPUME | Electricity: consumption 0.5 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUPUTO | Universal electromechanical machines for the manufacture of bands, diaphragms, buckles, power 0.75 kW | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUPUTO | Electricity: consumption 0.25 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||