The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUKA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-MEME-KALI_KARIRILI | Welding electrodes for welding low-alloy and carbon steels UONI 13/45, E42A, diameter 0.157-0.197 in | lb | ||||||||||
| KAVO-TO-KAPU-KARI_KAKAKATO | Hot-rolled round steel bar, steel grades St3sp, St3ps, diameter 2.05-2.76 in | ton | ||||||||||
| KAVO-TO-KAPU-KARI_KAKADXSA | Hot-rolled round steel bars, steel grades St3sp, St3ps, diameter 0.551-1.969 in | ton | ||||||||||
| MEPU-PU-KAME-KAME_KAKAKATO | GF-021 primer | ton | ||||||||||
| MEPU-PU-KAPU-KADX_KAKAMENE | Enamel HV-124, colored | ton | ||||||||||
| MEPU-SA-KADX-KALI_KAKATOKA | Solvent P-4 | ton | ||||||||||
| RITO-TO-KANE-KAPU_KAKAKANE | Non-galvanized welded steel water and gas pipes with thread, light, nominal diameter 0.787 in, wall thickness 2.5 mm | LF | ||||||||||
| DXME-MEPU-KARI_KAKAME | Flatbed trucks, load capacity up to 5 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KAME_KAMERI | High-pressure painting units for painting structural surfaces, power 1 HP (1 kW) | Machine hours | ||||||||||
| DXME-RIME-KAME_KAMERI | Electricity: consumption 0.23 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Pipe cutting machines, maximum pipe diameter 16.77 in | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Electricity: consumption 1.82 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||