| RITO-VO-KATO-MERI | Welded steel fittings, nominal diameter up to 31.50 in | ton | ||||||||||
| ME_MEKAKA_TOME | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KAME-KAME_KAKAKARI | AI-98, AI-95 automotive gasoline | ton | ||||||||||
| KAME-LI-MESA-KATO_KAKAPURI | Bolts with nuts and washers for construction | lb | ||||||||||
| KAME-LI-MEDX-KAPU_KAKAKARI | Rolled vulcanized rubber plates | lb | ||||||||||
| KAVO-ME-KARI-MEME_KAKAKAME | Forgings from square billets, weight 1.5-4.5 kg | ton | ||||||||||
| KAVO-RI-KARI-KASA_KAKAPUKA | Double-twisted rope LK-R, construction 6x19(1+6+6/6)+1 o.s., grade B, made of uncoated wire, marking group 1570-1770 N/mm2, diameter 0.472 in | 10 LF | ||||||||||
| KAVO-RI-KARI-MEME_KAKARIVO | Double-twisted TK rope, 6x37(1+6+12+18)+1 o.s. construction, grade B, made of galvanized wire, grade 1570-1770 N/mm2, diameter 5.0 mm | 10 LF | ||||||||||
| MEME-ME-KARI-KAPU_KAKATOME | Round coniferous timber, unpeeled, length 3-6.5 m, diameter 14-24 cm, grade II-III | CY | ||||||||||
| RITO-VO-KATO-KANE_KAKAMETO | Steel coupling assembly with coupling and lock nut, nominal diameter 2.56 in | EA | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MESA-KARI_KARIPU | Crawler tractors, power 108 HP (79 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KARI_KAKAME | Non-self-propelled barges, load capacity 100 tons | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIKA-KATO_KAKAME | Tugs, power 150 HP (110 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 3 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-KADX_KAKAME | Non-self-propelled floating cranes, 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 5 person-hours/machine-hours | Machine hours | ||||||||||
| DXME-RIKA-MEKA_KAKAPU | Floating platforms, collapsible, load capacity 31.97 ton | Machine hours | ||||||||||
| DXME-RIKA-MEME_KAKADX | Unloading pontoons, load capacity 1.5 t | Machine hours | ||||||||||
| DXME-RIKA-METO_KAKAME | Diving stations on a self-propelled boat, power 150 HP (110 kW) with compressor | Machine hours | ||||||||||
| PU_MEKAKA_KANEVO | Personnel: 6 people-hours/machine-hours | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||