| KARI-TO-KAME-KARI | Natural sand for construction work | CY | ||||||||||
| RIPU-TO-KASA-KANE | Heat-shrinkable sleeve for insulating welded joints | set | ||||||||||
| ME_MEKAKA_SANE | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | lb | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-MEME-KALI_KAMEVOTO | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 0.118 in | ton | ||||||||||
| KAME-LI-MEME-KALI_KAMEVOSA | Welding electrodes for welding low-alloy and carbon steels E60A, diameter 0.157 in | ton | ||||||||||
| KAME-LI-RIKA-KAVO_KAKASAME | Colored cotton rags | lb | ||||||||||
| KAVO-RI-KARI-KATO_KAKATOVO | Double-twisted rope LK-O, construction 6x19(1+9+9)+1 o.s., grade B, made of uncoated wire, marking group 1570-1770 N/mm2, diameter 32.5 mm | 10 LF | ||||||||||
| MEPU-PU-KAME-KADX_KAPURILI | Epoxy anti-corrosion primer with zinc content for protecting metal surfaces, consumption 0.041-0.080 lb/SF | lb | ||||||||||
| MEPU-SA-KADX-MEME_KAMEKARI | White spirit | lb | ||||||||||
| RITO-VO-KATO-KAME_KAKAKARI | Metal inventory plugs | ton | ||||||||||
| DXME-MEKA-KASA_KAMEKA | Pipe layers, rated load capacity 55.12 ton | Machine hours | ||||||||||
| PU_MEKAKA_KADXKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-METO-KATO_KANEME | Swamp vehicles, load capacity 39.68 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MESA-KAME_KAKAME | Tractor trailers, load capacity up to 2 tons | Machine hours | ||||||||||
| DXME-MESA-KARI_KARILI | Crawler tractors, power 180 HP (132 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KATOTO | Welding units for manual arc welding on a tractor, welding current up to 250 A, number of stations 2, tractor power 108 HP (79 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_KAPURI | Gas welding and cutting equipment | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-KATO_SAKARI | Sandblasting machines operating from mobile compressor units, volume up to 19 l, air consumption 270-700 l/min | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|