AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUTO | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | lb | ||||||||||
| KAME-TO-KATO-KAPU_KAKAKATO | Technical orthophosphoric acid | lb | ||||||||||
| KAME-TO-KATO-KANE_KAKAKATO | Technical hydrochloric acid | lb | ||||||||||
| KAME-TO-KASA-RITO_KAKANEME | Caustic soda, grade TD, technical | ton | ||||||||||
| KAME-LI-KARI-KALI_KAKAMEME | Pressboard, grade A | lb | ||||||||||
| KAME-LI-MEKA-KASA_KAKAKAME | Ground coke | ton | ||||||||||
| KAME-LI-MEME-KALI_KARIPUNE | Welding electrodes for welding heat-resistant austenitic and high-strength structural steels EA-395, diameter 0.079-0.197 in | lb | ||||||||||
| KAVO-TO-KATO-KAPU_KAKAPUTO | Black wire, diameter 1.0-1.1 mm | ton | ||||||||||
| RIME-ME-KASA-KAME_KAKAPUME | Flexible power cable with copper conductors KG 3x6-660 | 1000 LF | ||||||||||
| RIME-RI-KARI-KAME_KAKARITO | MG antenna wire, cross-section 4 mm2 | 1000 LF | ||||||||||
| RIME-RI-KATO-KASA_KAKAKARI | Power installation wire APuV 1x2.5-450 | 1000 LF | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electric overhead cranes, lifting capacity 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electricity: consumption 2.97 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KASASA | Electric winches with a pulling force of 19.62 kN (2.20 ton) | Machine hours | ||||||||||
| DXME-KANE-KATO_KASASA | Electricity: consumption 0.39 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAMENE | Pipe bending machines complete with mandrel for cold bending of pipes with an outer diameter of 20.00-40.16 in | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KAMENE | Electricity: consumption 18.15 kWh/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Drilling machines | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOME | Electricity: consumption 0.45 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOTO | Turning and screw-cutting machines | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATOTO | Electricity: consumption 2.52 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Pipe cutting machines, maximum pipe diameter 16.77 in | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Electricity: consumption 1.82 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||