AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| MELI-ME-KARI-KASA | Aluminosilicate products (low and medium alumina content) | ton | ||||||||||
| ME_MEKAKA_SATO | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| KATO-RI-KAME-KAME_KAKAKAME | Portland cement without additives for general construction CEM 0 32.5N | ton | ||||||||||
| MELI-PU-KATO-KAME_KAKAMERI | Refractory aluminosilicate fireclay mortar, grade MSH-42 | ton | ||||||||||
| DXME-KASA-KAME_KAMENE | Tower cranes, load capacity 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAME_KAMENE | Electricity: consumption 2.49 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electric overhead cranes, lifting capacity 5.51 ton | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAKASA | Electricity: consumption 2.97 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KATORI | Electric overhead cranes (crane beams), load capacity 5.51 ton | Machine hours | ||||||||||
| DXME-KASA-KAPU_KATORI | Electricity: consumption 3.33 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KARI_KAKASA | Sectional belt conveyors, length 131.2 ft | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KARI_KAKASA | Electricity: consumption 4.95 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KANE_KATOME | Two-mast freight lifts, lifting capacity up to 2 tons, height up to 196.9 ft | Machine hours | ||||||||||
| PU_MEKAKA_KATOKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KANE_KATOME | Electricity: consumption 0.65 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KAVO_KAKATO | Electric hoists, load capacity 2.20 ton | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARIME | Stationary mortar mixers for preparing cement-water and other mortars, capacity 350 l | Machine hours | ||||||||||
| DXME-KALI-KAVO_KARIME | Electricity: consumption 1.32 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-KADX-KASA_KARIRI | Broad gauge shunting locomotives, power 750 HP (550 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KARI_KAKATO | Flatbed trucks, load capacity up to 10 tons | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KATO_KAKARI | Dump trucks, load capacity up to 11.02 ton | Machine hours | ||||||||||
| DXME-RIME-MEDX_KARIPU | Ceramic cutting machines | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KARIPU | Electricity: consumption 0.53 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||