AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUTO | Worker Category 1 | hrs | ||||||||||
| KAME-TO-KARI-KARI_KAKAKARI | Argon gas, highest grade | CY | ||||||||||
| KAME-TO-KARI-KAVO_KAKAKAME | Technical gaseous oxygen | CY | ||||||||||
| KAME-TO-KARI-KADX_KAKARIRI | Propane-butane technical mixture | lb | ||||||||||
| KAME-TO-KAPU-KARI_KAKAKAPU | M-10DM diesel engine oil | lb | ||||||||||
| KAME-LI-KARI-KANE_KAKAMELI | Construction cardboard spacer, grade B | ton | ||||||||||
| KAME-LI-KATO-KAME_KAKAKARI | Tap water | CY | ||||||||||
| KAME-LI-KATO-KAPU_KAKAKAME | Electricity | kWh | ||||||||||
| KAME-LI-KAVO-KAPU_KAKAKATO | Natural ground chalk | ton | ||||||||||
| KAME-LI-MEME-KAPU_KAKASARI | Uncoated welding wire SV-08G2S, diameter 0.079 in | lb | ||||||||||
| KAME-LI-MEME-KALI_KAMENESA | Welding electrodes for welding low-alloy and carbon steels MP-3, diameter 0.118 in | lb | ||||||||||
| KAME-LI-MEME-KALI_KARITOKA | Welding electrodes for welding low-alloy and carbon steels UONI 13/55, E50A, diameter 0.157-0.197 in | lb | ||||||||||
| KAME-LI-MEME-KALI_KATOMETO | Tungsten welding electrodes for welding high-alloy and refractory steels | lb | ||||||||||
| KAME-LI-RIKA-KAVO_KAMERIRI | Cotton wipes, dimensions 400x15.75 in, surface density from 105 to 0.384 oz/SF | SF | ||||||||||
| KALI-RI-KALI-MERI_KAKAKAME | Auxiliary metal structures predominantly made of thick-gauge steel or rolled sections, with or without holes | ton | ||||||||||
| MEPU-PU-KARI-KAPU_KAMENERI | Oil paint MA-011-0, MA-011-1, MA-011-1N, MA-011-2, MA-011-2N | ton | ||||||||||
| MEPU-SA-KADX-KAME_KAKAKAME | Technical acetone, grade I | lb | ||||||||||
| DXME-KASA-KAPU_KAMETO | Electric bridge cranes, lifting capacity 137.79 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KAPU_KAMETO | Electricity: consumption 53.13 kWh/machine-hour | Machine hours | ||||||||||
| DXME-KASA-KALI_KAKATO | Railway cranes, lifting capacity 27.56 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASASA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KANEKA | Electric winches with a pulling force of up to 5.79 kN (0.59 t) | Machine hours | ||||||||||
| DXME-KADX-KATO_KATOSA | Wide gauge platforms, load capacity 80.47 ton | Machine hours | ||||||||||
| DXME-MEKA-KAPU_KAPUME | Equipment for chemical cleaning of oil pipelines | Machine hours | ||||||||||
| DXME-MELI-KARI_KATORI | Ultrasonic flaw detectors, thickness of the product being inspected up to 236.22 in | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITORI | Three-phase welding inverters for argon arc welding, maximum welding current 500 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITORI | Electricity: consumption 3.52 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Welding machines for manual arc welding, welding current up to 350 A | Machine hours | ||||||||||
| DXME-MELI-KAPU_RITOTO | Electricity: consumption 3.7 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKALI | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 5.4 m3/min | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Pumps, capacity 261.6 CY/h, head 82.0 ft, power 30 HP (22 kW) | Machine hours | ||||||||||
| DXME-MEDX-KAVO_KAMESA | Electricity: consumption 7.26 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Pipe cutting machines, maximum pipe diameter 16.77 in | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-MEDX_KATONE | Electricity: consumption 1.82 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUDXME | Universal hydraulic pipe benders | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-RIME-RIRI_PUDXME | Electricity: consumption 0.25 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||