AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUDX | Worker Category 1 | hrs | ||||||||||
| RIKA-ME-KARI-MEPU_KAKAKARI | Earring Sr-4.5 075 | EA | ||||||||||
| RIKA-ME-KARI-MESA_KAKAMESA | Copper wire connector (SOM) 062-1 | EA | ||||||||||
| RIKA-ME-KARI-RIME_KAKAMERI | KS-156 anchoring unit | EA | ||||||||||
| RIKA-ME-KARI-RIRI_KAKAKATO | Two-pronged eye U2-12-16 | EA | ||||||||||
| RISA-RI-KAME-KANE_KAKAKARI | KS-035 wedge clamp for earrings with wedge | EA | ||||||||||
| RISA-RI-KAME-KANE_KAKAKATO | End collet clamp KS-086 | EA | ||||||||||
| RISA-RI-KAME-KANE_KAKAMEME | KS-053-1 (KS-323) power clamp | EA | ||||||||||
| RISA-RI-KAME-KANE_KAKATORI | KS-066-2 flat clamp for grounding wire | EA | ||||||||||
| RISA-RI-KAME-KANE_KAKASARI | KS-054-1 (KS-324) connecting clamp | EA | ||||||||||
| RISA-RI-KAME-MEKA_KAKAKAPU | Rocker arm for two contact wires KS-158 | EA | ||||||||||
| RISA-RI-KAME-MEME_KAKAKARI | KS-006 fork clamp for earring | EA | ||||||||||
| RISA-RI-KAME-RIKA_KAKAMEKA | KS-1172 piston rod, galvanized, length 39.37 in | EA | ||||||||||
| RISA-RI-KAME-RIME_KAKAPURI | KS-078 locks | 100 EA | ||||||||||
| RISA-RI-KAME-RIME_KAKANEME | KS-082 connecting plate | EA | ||||||||||
| RISA-RI-KARI-KANE_KAKAKARI | Double galvanized steel load restraint, type KS-152 | EA | ||||||||||
| RISA-RI-KARI-MEKA_KAKAKAPU | Galvanized steel double bar for cargo, type KS-106, dimensions 460x59.45 in | EA | ||||||||||
| DXME-KADX-KAME_KAMEME | Railcars for operation on a contact network with an insulated mounting platform and a crane unit equipped with removable cradles | Machine hours | ||||||||||
| PU_MEKAKA_KANESA | Personnel: 2 person-hours/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||