AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ME_MEKAKA_PUDX | Worker Category 1 | hrs | ||||||||||
| KAME-PU-KARI-KARI_KAKAKATO | Straight flat cutter for cutting soil, reinforced with a G24a-02 product of the VK8V brand, length 3.74 in, height 1.02 in, thickness 0.512 in | EA | ||||||||||
| DXME-KATO-KASA_KAMENE | Tunneling machines for horizontal and inclined workings with a cross-section of 4.7-15 m2 | Machine hours | ||||||||||
| DXME-KATO-KASA_KAMENE | Electricity: consumption 114 HP (85 kW)·h/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KATO_KASAPU | Mine maneuvering winches for pulling mine cars to the first break | Machine hours | ||||||||||
| DXME-KANE-KATO_KASAPU | Electricity: consumption 0.39 kW·h/machine-hour | Machine hours | ||||||||||
| DXME-KADX-KARI_KAKAVO | Non-tipping mine cars, capacity 2.5 m3 | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||