AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RISA-ME-KAME-KASA | Impregnated sleepers and half-sleepers | EA | ||||||||||
| RISA-ME-KASA-KAME | Shoes for broad gauge railways | ton | ||||||||||
| RISA-ME-KASA-KASA | Broad gauge railway rails (type P50) | LF | ||||||||||
| ME_MEKAKA_RITO | Worker Category 1 | hrs | ||||||||||
| RISA-ME-KAPU-KAPU_KAKAKARI | Track bolts for fastening rails, diameter M24, length 5.51 in, 6.30 in, with nut diameter M24 | ton | ||||||||||
| RISA-ME-KAPU-KALI_KAKAKATO | Track screws with square head, diameter M24, length 6.69 in | ton | ||||||||||
| RINE-ME-KARI-KATO_KAKARIME | Rail fastening pad, type "Metro" P50 | EA | ||||||||||
| RINE-ME-KARI-KAPU_KAKAKASA | Polymer gasket for underlay, type "Metro" P50, dimensions 320x6.30 in | EA | ||||||||||
| DXME-KASA-KASA_KAMESA | Mobile cranes, lifting capacity 17.64 ton | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KADX-MERI_SAMEPU | Rail benders, bending force up to 39.68 ton | Machine hours | ||||||||||
| DXME-MELI-KARI_KATORI | Ultrasonic flaw detectors, thickness of the product being inspected up to 236.22 in | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||