AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-LI-KADX-KAPU | Cumulative perforator adapter | EA | ||||||||||
| KAME-LI-KADX-KAPU | Cumulative perforator tip | EA | ||||||||||
| KAME-LI-KADX-KAPU | Cumulative perforator sealing ring | EA | ||||||||||
| KAME-LI-KADX-KAPU | Cumulative perforator centering device | EA | ||||||||||
| KAME-LI-KADX-KAPU | Electrical input for cumulative perforator | EA | ||||||||||
| KAME-LI-KADX-KAPU | Cumulative charge | EA | ||||||||||
| KAME-LI-KADX-KAPU | Cumulative perforator section | EA | ||||||||||
| KAME-LI-KADX-KAPU | Cumulative perforator head | EA | ||||||||||
| KAME-LI-KADX-KAPU | Cumulative perforator contact | EA | ||||||||||
| KAME-LI-MESA-KAPU | Screw | EA | ||||||||||
| RIME-RI-KATO-KARI | MGLF wire | 1000 LF | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| RI_MEKAKA_KASA | Grade 5 worker | hrs | ||||||||||
| KAME-TO-KAME-KANE_KAKASATO | CIATIM-201 lubricant | lb | ||||||||||
| KAME-LI-KADX-KATO_KAKATOME | DSHT-150/800 detonating cord | LF | ||||||||||
| KAME-LI-KADX-KAPU_KAKANEDX | PVP-N explosive cartridge | EA | ||||||||||
| KAME-LI-KADX-KAPU_KAKALIME | Universal detonation repeater for receiving and transmitting detonation between sections of perforating systems, explosive mass 0.75 g | EA | ||||||||||
| DXME-KANE-KADX_KASATO | Non-self-propelled electric logging lifts, well exploration depth up to 3280.8 ft | Machine hours | ||||||||||
| PU_MEKAKA_KAPUKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KADX_KASATO | Electricity: consumption 1.65 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||