AI
Workers
Use this position in your own project
The price above is a reference benchmark. OpenConstructionERP lets you reuse this position in a full project estimate — with your regional prices, quantities and margins.
KI
Work Steps
Generating image...
15-30 seconds
Error
:
|
CO₂ (kg)
|
|
Alternative
|
Optimization
|
Where to Buy
|
Safety / PPE
|
|||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| KAME-PU-KAME-KATO | Three-cone drill bits | EA | ||||||||||
| KAME-PU-KAME-KANE | Drill bits | EA | ||||||||||
| ME_MEKAKA_PUKA | Worker Category 1 | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| DXME-KAPU-KAME_KALIME | Drilling rigs for percussion drilling, drilling depth up to 82.0 ft, hole diameter 1.89-2.36 in when operating from mobile compressor units | Machine hours | ||||||||||
| DXME-MEVO-KAME_KAKAVO | Mobile screw compressors with internal combustion engines, pressure up to 0.7 MPa (7 atm), capacity up to 15.7 CY/min | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-MEDX-KAPU_KAKAME | Drilling pumps for pumping flushing fluid, flow rate 0.9-7.2 m3/h, head 400-656.2 ft | Machine hours | ||||||||||
| DXME-MEDX-KAPU_KAKAME | Electricity: consumption 3.63 kW·h/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||