| KAME-LI-KAVO-KASA | Additives for concrete preparation | lb | ||||||||||
| KARI-RI-KASA-KAPU | Crushed stone (gravel) | CY | ||||||||||
| KARI-TO-KAME-KARI | Sand | CY | ||||||||||
| KATO-RI-KAME-KAME | Cements | ton | ||||||||||
| RI_MEKAKA_KARI | 2nd grade worker | hrs | ||||||||||
| RI_MEKAKA_KATO | Grade 3 worker | hrs | ||||||||||
| RI_MEKAKA_KAPU | Grade 4 worker | hrs | ||||||||||
| KAME-LI-KATO-KAME_KAKAKAME | Water | CY | ||||||||||
| DXME-KAME-KAME_KATOSA | Bulldozers, power 108 HP (79 kW) | Machine hours | ||||||||||
| PU_MEKAKA_KANEKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KANE-KASA_KASALI | Single-bucket universal front pneumatic wheel loaders, nominal capacity of the main bucket 1.5 m3, load capacity 3.31 ton | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
| DXME-KALI-KAME_KAMEME | Cement silos, capacity 40 tons | Machine hours | ||||||||||
| DXME-KALI-KASA_KAKATO | Automated concrete plants, capacity 78.5 CY/h | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 9 persons-hours/machine-hours | Machine hours | ||||||||||
| DXME-KALI-KASA_KAKATO | Electricity: consumption 35.02 kWh/machine-hour | Machine hours | ||||||||||
| DXME-MEPU-KALI_KAMEME | Cement tankers, tank capacity 17.0 CY | Machine hours | ||||||||||
| PU_MEKAKA_KASAKA | Personnel: 1 person-hour/machine-hour | Machine hours | ||||||||||
|
CO₂ (kg) — Zusammenfassung
|
||||||||||||
|
CO₂ (kg) wird analysiert...
|
||||||||||||
|
Reg. Price — Zusammenfassung
|
||||||||||||
|
Reg. Price wird analysiert...
|
||||||||||||
|
Alternative — Zusammenfassung
|
||||||||||||
|
Alternative wird analysiert...
|
||||||||||||
|
Optimization — Zusammenfassung
|
||||||||||||
|
Optimization wird analysiert...
|
||||||||||||
|
Where to Buy — Zusammenfassung
|
||||||||||||
|
Where to Buy wird analysiert...
|
||||||||||||
|
Safety / PPE — Zusammenfassung
|
||||||||||||
|
Safety / PPE wird analysiert...
|
||||||||||||
approx.
| kWh | ||||||
|---|---|---|---|---|---|---|
|
KI
|
- | |||||